What tests need to be done before installing a 1000KVA transformer?

What tests need to be done before installing a 1000KVA transformer?

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-12-07
  • Views:0

(Summary description)Tests are usually carried out before the transformer is installed and commissioned. The following tests were done; 1. Visual inspection 2. Insulation resistance test 3. Transformation ratio test 4. Vector group test 5. Magnetizing current test 6. Core balance test 7. Winding resistance test

What tests need to be done before installing a 1000KVA transformer?

(Summary description)Tests are usually carried out before the transformer is installed and commissioned. The following tests were done; 1. Visual inspection 2. Insulation resistance test 3. Transformation ratio test 4. Vector group test 5. Magnetizing current test 6. Core balance test 7. Winding resistance test

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-12-07
  • Views:0
Information

Tests are usually carried out before the transformer is installed and commissioned. The following tests were done; 1. Visual inspection 2. Insulation resistance test 3. Transformation ratio test 4. Vector group test 5. Magnetizing current test 6. Core balance test 7. Winding resistance test